HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Setting of the buffer tank location and dimension specifications

2016-04-11View Original

Thread Content

A buffer tank is installed at the pump outlet to stabilize pressure, and a flow meter is also present on the discharge pipeline. Existing issues: 1. After coming out of the pump, should it pass through the buffer tank first or the flow meter first? ; 2. When considering a buffer tank, is it sufficient to only take into account its volume, or does one also need to consider its shape (square, circular) and diameter (equivalent diameter)? The existing experimental equipment has a diameter of DN300, and the buffer tank is also designed with a DN300 diameter (this serves to extend the setup in front of the experimental equipment and act as a buffer). A sintered plate is used to separate the buffering device from the experimental apparatus (this creates some resistance, which helps to ensure a uniform pressure distribution). The medium used is compressed gas; I’m not sure if this approach is appropriate.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.