HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Daily Question, April 12, 2016: Feed to the catalytic pre-hydrogenation reaction system

2016-04-12View Original

Thread Content

This post was last edited by Refiner on 2016-4-13 at 13:10. Before feeding into the pre-hydrogenation reaction system, which of the following conditions does not need to be met yet? (  ) A. The temperature of the reforming reaction system reaches 370°C. B. Drying of the pre-hydrogenation catalyst is complete. C. Airtightness testing of the pre-hydrogenation system is complete. D. Hydrogen purging in the pre-hydrogenation system is satisfactory. Answer: A
Reply #22016-04-12
A. The temperature of the reforming reaction system reaches 370℃
Reply #32016-04-12
Before feeding into the pre-hydrogenation reaction system, which of the following conditions does not need to be met temporarily? ( A ). A. The temperature of the reforming reaction system reaches 370°C. B. Drying of the pre-hydrogenation catalyst is complete. C. Airtightness testing of the pre-hydrogenation system is complete. D. Hydrogen purging in the pre-hydrogenation system is satisfactory
Reply #42016-04-12
Before feeding into the pre-hydrogenation reaction system, which of the following conditions does not need to be met temporarily? ( A ). A. The temperature of the reforming reaction system reaches 370°C. B. Drying of the pre-hydrogenation catalyst is completed. C. Airtightness testing of the pre-hydrogenation system is complete. D. Hydrogen purging in the pre-hydrogenation system is successful
Reply #52016-04-12
A. The temperature of the reforming reaction system reaches 370℃
Reply #62016-04-12
A. The temperature of the reforming reaction system reaches 370℃
Reply #72016-04-12
A. The temperature of the reforming reaction system reaches 370℃
Reply #82016-04-12
Before feeding into the pre-hydrogenation reaction system, which of the following conditions does not need to be met temporarily? ( A ). A. The temperature of the reforming reaction system reaches 370°C. B. Drying of the pre-hydrogenation catalyst is completed. C. Airtightness testing of the pre-hydrogenation system is complete. D. Hydrogen purging in the pre-hydrogenation system is successful
Reply #92016-04-12
A. The temperature of the reforming reaction system reaches 370℃
Reply #102016-04-12
A. The temperature of the reforming reaction system reaches 370℃

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.