HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

There is a long-distance pipeline, and I want to bury a pipe that intersects with it

2016-04-19View Original

Thread Content

There is a long-distance pipeline buried at a depth of 1.5 m. Is it possible to have a pipeline buried at a depth of 0.6m pass through it? Are there any laws or regulations that prohibit it?
Reply #22016-04-19
The specifications for oil and gas pipelines require a vertical clearance of not less than 0.3 meters, in addition to other requirements
Reply #32016-04-21
Article 4.2.11 of GB50253 2014 stipulates GB50251 2015

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.