I would like to ask the experts here! What is the approximate engineering design cost for a plant capable of producing 200,000 Nm3 of coal-based gas, including desulfurization and shift conversion?
About five million should be enough to get it done. But the market conditions are poor now, so it’s very likely to drop even further!
Basic design or detailed design? For the basic design, I agree with the opinion on the 2nd floor.
Is the basic design only worth 5 million? Isn’t the design fee charged at 3-5% of the project investment?
These days, there are people who can handle both the basic design and the detailed design at this price! Hehe
1. If followed by the **recommended design fee rate, it is 8% of the direct project costs, plus 11% of the cost of non-standard equipment**; 2. But now that it has been marketized, under competitive conditions, 3-5% is a relatively normal competitive price ; 3. Since the beginning of 2015, as the crude oil market plummeted, the coal chemical industry suffered a sharp decline; numerous coal chemical projects were halted or delayed. Even projects with a basic design cost of 5 million yuan or less found sponsors willing to take them on. 4. But their ultimate goal is to focus on the subsequent EPC turnkey contract.
There are even contracts worth “0” ten thousand, can you believe it?
500W, BE+DE – I don’t think so. After all, we can’t expect the engineering company to cover the costs itself Unless there is an EPC turnkey contract.