HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Safety Technology Exchange Edition: Daily Question (2016.5.13)

2016-05-13View Original

Thread Content

bg8.png Type: Fill-in-the-blank question. Question: [Safety Techniques for Temporary Electrical Work] 1. When connecting or disconnecting temporary electrical circuits at a switch, the upstream switch should be ____ and a safety warning sign should be placed on it. 2. The temporary electrical distribution panels and boxes at the site should have ____ and hazard signs; they must also have rain protection measures. The panels, boxes, and doors should be able to close tightly and be locked. Power-off locking ; Voltage label
Reply #22016-05-13
1. When connecting or removing temporary power circuits at a switch, the upstream switch should be _depowered and locked___, with a safety warning sign placed on it. 2. The temporary electrical distribution panels and boxes on site should have __voltage labels__ and hazard signs; they must also be protected from rain. The panels, boxes, and doors should be able to close tightly and be locked.
Reply #32016-05-13
1. When connecting or removing temporary power circuits at a switch, the upstream switch should be __turned off__ and a safety warning sign should be placed there. 2. The temporary electrical distribution panels and boxes at the site shall have _rain protection measures__ and hazard signs; they must be equipped with rain protection, and their doors shall be able to close securely and be locked.
Reply #42016-05-13
Warning sign for disconnecting temporary power supply
Reply #52016-05-13
1. When connecting or removing temporary power circuits at a switch, the upstream switch should be powered off and locked _ along with a safety warning sign being placed there. 2. The temporary electrical distribution panels and boxes on site should have __numbers, voltage labels__, and hazard signs; they must also be protected from rain. The panels, boxes, and doors should be able to close tightly and be locked.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.