Regarding turbine commissioning

2016-07-11View Original

Thread Content

During today’s testing, it was discovered that there was a baffle inside the flange connecting the heat well to the steam trap expansion tank, which caused the liquid level in the steam trap expansion tank to become extremely high and led to significant vibration in the pipelines. The vacuum was broken to remove the plug plate, and thus today’s turbine testing is declared complete. The baffle couldn’t be detected – is there an issue with the inspection procedure, or is the baffle simply too sneaky to be detected? Let’s all discuss together the inspection procedures and the methods for checking the internal baffles in flanges. Looking forward to it
Reply #22016-07-11
It is usually due to human negligence; it’s also possible that it was too hidden to be noticed
Reply #32016-07-11
There should be records of the installation and removal of blind flanges, right?
Reply #42016-07-12
It is believed that this was caused; it is recommended to keep records and label them by category
Reply #52016-07-12
This phenomenon is normal; it’s during testing that problems are identified. . Also, your work isn’t done very well. . Inspection was inadequate. .
Reply #62016-07-12
Was it not taken into account when the plan was made? Or, it’s assigned to individuals, but the checks aren’t thorough enough~~
Reply #72016-07-13
Establish a strict management system for work permits related to the installation and removal of blind flanges; don’t be afraid of the hassle – this time it only resulted in an abnormally high liquid level, but what about next time? Failing to extract what needs to be extracted or to add what needs to be added can lead to serious accidents.
Reply #82016-07-13
Fortunately, it wasn’t a major issue; the unit was not damaged. In our factory, the turbine bearing surfaces were damaged due to inadequate inspections; it seems that strengthening management through proper systems is crucial!
Reply #92016-07-13
There is still a lack of responsibility; there should be records of installation and records of removal.
Reply #102018-09-04
Returning to this post after two years; thanks to everyone for their replies

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.