It is now necessary to add 4 two-wire transmitters to the control room. Since the project was carried out a long time ago, there are no cables available, so rewiring is required. Running 4 two-core cables seems like too much work, while using 1 eight-core cable appears unsafe. What are everyone’s thoughts on this? {:3_46:}
Reply #22016-08-30
Why isn’t an 8-core version safe? A single screen or split screen is fine! But a junction box needs to be added in the middle!
Reply #32016-08-30
If using cable trays, tying 4 two-core cables together and pulling them should not be too much work, right? If you’re afraid of hassle, 2 four-core cables will do; P. There is no problem with the eight-core shielded cable either; an explosion-proof junction box can be added on-site ; I have worked on 32-core ones as well. Also, what is your distance? Approximately how many meters?
Reply #42016-08-30
The main cable uses 6*2*1.0 (or 1.5, depending on the distance), with junction boxes installed nearby at the site; there are also two spare cores, which I think is better than using 4 cables.
Reply #52016-08-31
In our company, 32-core cables are used for the connection from the JB box to the DCS, over a distance of around 400 meters. No problem at all
Reply #62016-08-31
Well, I’ve decided to use a 10-core main screen with split screens. The reason is that in the old projects, some multi-core cables didn’t have split screens, which caused interference and made everything unusable; it was quite problematic
Reply #72016-08-31
When ordering multi-core wires, ask the manufacturer to label them with the wire numbers; for a length of 350 meters, it is recommended to use two-core wires
Reply #82016-08-31
A single screen or split screens will suffice; additionally, two sets can be reserved as spare wires, so that no new cables need to be installed in case of future modifications or issues with the existing wiring!
Reply #92016-09-01
A two-core cable is recommended; it’s stable and simple.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.