Participation reward: 2 Wealth. Reward for the correct answer: 9 Wealth. The construction joints in reinforced concrete columns should generally be placed at ( ). A. Top surface of the foundation B. Below the beam C. Below the column cap of a slab-on-grade floor D. Below the bracket of a crane beam E. Within the middle 1/3 of the column Correct answer: ABCD
Reply #22016-09-03
The construction joints in reinforced concrete columns should generally be placed at (ABC). A. Top surface of the foundation B. Below the beam C. Below the column cap of a slab-on-grade D. Below the bracket of a crane beam E. Within the middle 1/3 of the column
Reply #32016-09-03
The construction joints in reinforced concrete columns should generally be placed at (ABCD). A. Top surface of the foundation B. Below the beam C. Below the column cap of a slab-on-grade D. Below the bracket of a crane beam E. Within the middle 1/3 of the column
Reply #42016-09-03
ABCD,,,,,,,,

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.