Why do we need to send the drawings to a drawing review center for approval when working on a project? Is the design review carried out during the preliminary design phase or the construction drawing phase?
There is no reason for this rule; just as in the drawings, in addition to the designer’s signature, there are also checks and reviews. Drawing review is carried out during the construction drawing phase.
Graphic review is not due to a lack of trust in the design firms’ capabilities; rather, once these firms become part of the market competition, they are often subject to the demands of their clients, and sometimes forced to accommodate the owners’ wishes. For example, some developers, in an effort to maximize their profits, frequently make unreasonable requests for cost cuts. Reviewing drawings is an important step to ensure compliance with mandatory standards. Both the drawing review agencies and individuals must possess **appropriate qualifications; each set of construction drawings must be stamped with the special seal for design drawings and the special seal for drawing review.
However, the drawing review for chemical engineering projects is often constrained by the expertise of the drawing review centers designated by the housing and construction authorities; generally, only the floor plans, elevation views, sectional views, and site layout plans of the building need to be provided for review, and only after that can a construction permit be applied for. No drawing review is required for other specialties such as processes, equipment, structures, electrical and instrumentation.
Sir, I’ve heard that in addition to the building structure, aspects such as water supply and drainage, HVAC systems, and building electrical systems also need to be reviewed. I would like to ask what the purpose of reviewing these aspects is ? Thank you!
:):):):):):victory::victory::victory::victory::victory::victory::victory:
If it’s a real estate project, all relevant specialties need to conduct reviews. If it’s a chemical engineering project, even if you ask him to review it, he won’t be able to do it. With their limited skills, they can only deal with developers.
**The department’s review focuses on the company’s impact on the outside world, including aspects such as safety, environmental protection, and compliance; it does not pay attention to the economic efficiency, reliability, or profitability of the manufacturing processes. After all, **it serves the public interest, so regulation is necessary. The preliminary design should be submitted for review, including the preparation of various specialized review documents.
Doesn’t a structural diagram require review by an expert?