Participation reward: 2 Wealth. Reward for the correct answer: 9 Wealth. Regarding the conditions under which construction project claims are valid, which of the following statements is correct? A. The incident that gives rise to the claim must be the fault of the other party for the claim to be valid. B. As long as the other party is at fault, a claim can be filed regardless of whether any damage has occurred. C. As long as the facts underlying the claim exist, a claim can be filed at any time during the validity period of the contract. D. A claim cannot be accepted if it is not submitted in accordance with the procedures specified in the contract. Correct answer: D
D. If the claim report is not submitted in accordance with the procedures specified in the contract, the claim cannot be accepted
Regarding the conditions for the establishment of claims in construction projects, which of the following statements is correct? (D) A. The incident that gives rise to the claim must be due to the other party’s fault for the claim to be valid. B. As long as the other party is at fault, the claim can be valid regardless of whether any loss has occurred. C. As long as the facts underlying the claim exist, a claim can be filed at any time during the validity period of the contract. D. A claim cannot be valid if it is not submitted in accordance with the procedures specified in the contract