HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Determination of the explosion protection rating for industrial facilities

2016-11-11View Original

Thread Content

I recently came across a project related to the treatment of organic waste gases from chemical plants, whose main components are non-methane hydrocarbons; The treatment process is RTO ; The owner insists that the power cabinets, instrument cabinets, instruments, and cables all be made to the BT4 explosion-proof rating. Since the equipment will be placed outdoors in the future, and RTO devices cannot be made to meet explosion-proof standards (they can only provide explosion venting), I don’t think it’s necessary to make them all explosion-proof, as that would increase costs ; What do you all think? Have you encountered such a situation?
Reply #22016-11-12
Viewing electrical drawings: Explosion hazard zone classification diagram
Reply #32016-11-12
1. Check the explosion-proof area classification diagram for the electrical engineering field. 2. Check what the original explosion-proof type is. 3. Consider explosion-proof and non-explosion-proof layouts.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.