HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Daily Safety and Fire Prevention Question (11.14)

2016-11-14View Original

Thread Content

1. When the wiring is installed concealed, it must be protected by metal conduits or flame-retardant rigid plastic conduits, and it should be laid within a non-combustible structure; the thickness of the protective layer shall not be less than (  ) mm. A.10B.20C.30D.502. The correct inspection requirements for fire sealing are (  ). A. In cable tunnels that are passed through by people, expansion-type fire-resistant steel plates should be used for reinforcement at the bottom of the pre-existing openings. B. Cable shafts should be equipped with expansion-type fire-blocking systems. C. Electrical cabinet openings should be sealed with fire-resistant mineral wool boards. D. The cables on both sides of the fire-blocking system should be coated with cable paint. Reference answers: 1.C 2.D
Reply #22016-11-14
C1. When the cable is installed concealed, it must be protected by metal conduits or flame-retardant rigid plastic conduits, and it should be laid within a non-combustible structure; the thickness of the protective layer shall not be less than ( C ) mm. A.10B.20C.30D.502. The correct requirement for inspecting fire sealing is ( D ). A. In cable tunnels that are passed through by people, expansion-type fire-resistant steel plates should be used for reinforcement at the bottom of the pre-existing openings. B. Cable shafts should be equipped with expansion-type fire-resistant sealing materials. C. Electrical cabinet openings should be sealed with fire-resistant mineral wool boards. D. The cables on both sides of the fire-resistant sealing system should be coated with cable paint

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.