2016-11-21 Multiple-choice questions (3 points for participation, 8 points for correct answers)

2016-11-21View Original

Thread Content

What to do in case of flooding ( ) A. Temporarily shut down the feed; B. Reduce heat load ; C. After the tower is operating normally, introduce the feed liquid gradually and adjust it to normal ABC levels
Reply #22016-11-21
A. Temporarily shut down feeding; B. Reduce heat load ; C. After the tower is operating normally, introduce the feed liquid gradually and adjust it to normal levels
Reply #32016-11-21
Good morning. Are these three sequential actions? A. Temporarily shut down feeding ; B. Reduce heat load ; C. After the tower is operating normally, introduce the feed liquid gradually and adjust it to normal levels
Reply #42016-11-21
A. Temporarily shut down feeding; B. Reduce heat load ; C. After the tower is operating normally, introduce the feed liquid gradually and adjust it to normal levels

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.