HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Process configuration of the main methanol production unit using coal with a capacity of over 900,000 tons

2016-11-22View Original

Thread Content

Dear experts, I would like to know about the process configurations of large-scale coal-to-methanol plants in China with a capacity of over 900,000 tons. For example: how many series are there in the gasification unit (with each furnace counted as one series), and what is the configuration for the conversion unit? Series: Purify to? What is the synthesis of the series? Series. . . . . .
Reply #22016-11-22
For units with a capacity of less than 1 million tons, gasification usually involves 3 units in operation and 1 as backup, while for conversion, low-pressure washing, and synthesis, one set is sufficient. For units with a capacity of over 1 million tons, gasification requires 5 or 6 units in operation and 2 as backup; again, two sets are needed for conversion, low-pressure washing, and synthesis

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.