How is the workload calculated during demolition and installation?

2016-11-25View Original

Thread Content

Is the method for calculating the workload the same for demolition and installation? Is it done using the following method: Does the pipeline require knowing its diameter and length? Does the device show statistics on weight and size? Do you need the dimensions and quantity of the pipe fittings? Does civil engineering statistics track the cubic volume of soil, gravel, and concrete? Who is needed to do these tasks? Which departments need to be involved in the verification?
Reply #22016-11-25
Take a look at the measurement specifications for installation work, as well as those for maintenance and demolition work; it’s all explained clearly there.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.