HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Daily Water Treatment Question (11.29)

2016-11-29View Original

Thread Content

1. During the shutdown of the biochemical tank in the activated sludge process, the incorrect practice is ( ). A. After stopping the water supply, cease adding the pH regulator. B. After stopping the water supply to the biological treatment tank, continue aeration and keep adding phosphates as usual. C. Gradually reduce the number of operating cycles of the biological treatment tank based on the water volume. D. Gradually reduce the amount of water supplied. 2. During the shutdown process of the biological treatment tank in the activated sludge process, which sequence of operations is incorrect? ( ) A. Stop the water supply first, then stop aeration. B. Stop the phosphate preparation system first, then the point where phosphates are added. C. Adjust the oxygen supply level first, then reduce the water inflow volume. D. Stop the water supply first, then stop recirculation. B;C

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.