For workers involved in the production of large-scale air separation units, bare-cooling operations may have been experienced or may not have been encountered yet. So, what needs to be done during such operations? Are there any particular things to keep in mind regarding adjustment? What else should be paid attention to on site? How should the blow-off valves and liquid blowing valves on the distillation column be properly controlled for opening and closing? What are some other tips for controlling the blow-off valve? Let’s now bring together those of us who have previously carried out operations in cold conditions without protective gear to discuss this matter. By pooling our ideas, we can develop a set of guidelines and practical experiences that will help our colleagues refer to when facing similar situations in the future, thus avoiding unnecessary mistakes We welcome everyone to participate actively, speak up, and contribute their part and positive energy as members of the air separation team!
Everyone participated enthusiastically and spoke actively; I’m here to learn*
Visual inspection in a cold state reveals many design and installation issues~~such as cracked pipes, or direct contact between pipes and supports~~It serves as a test run inspection before filling the pipes with sand~~
Newly installed equipment requires operation at ambient temperature so that issues can be identified for repair and maintenance, thereby avoiding increased costs associated with the use of perlite filler
It’s basically similar to the cooling phase during hot start-up