HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Welding sequence issue for the wall plates of vertical cylindrical welded steel storage tanks

2016-12-09View Original

Thread Content

A 5,000 cubic meter internal floating roof tank is constructed using the inverted construction method; according to the specifications, the longitudinal seams are welded first, followed by the circumferential seams, with the outer sides being welded before the inner sides. May I weld the outer longitudinal seams and outer circumferential seams first, and then the inner longitudinal seams and inner circumferential seams? Newbie, thank you, expert!

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.