HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Issues with pipeline installation documents

2016-12-14View Original

Thread Content

The pipeline installation documents submitted by the construction party contain records only for the main pipelines; are records needed for the other pipelines as well?
Reply #22016-12-14
Plumbing pipes, as well as pipes for utility services (water, gas, steam, air), are all required
Reply #32016-12-14
In my personal opinion, both are necessary. This includes as-built drawings, material tracking reports, welding/inspection/NDT reports, and so on. . .

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.