How is the diameter of the unloading pipe calculated? What parameters are needed, and what is the formula?
Reply #22018-04-10
The net volume of the vehicle, the time required to unload it, and the method used for unloading, such as nitrogen or pumps
Reply #32018-04-10
It depends on the size of the opening in your tank
Reply #42018-04-10
The net volume is 65 m3, and a pump is used to complete the unloading process within 30–40 minutes
Reply #52018-04-10
Don’t you already have a pipe diameter? What other pipe diameter do you need?
Reply #62018-04-10
The key is to look at the rated flow rate of your pump. The flow rate of pumps imported with DN80 is generally around 40 cubic meters. You can take this as a reference
Reply #72018-04-10
Determine whether to arrange the pipes around the pump or the pump around the pipes. Calculate the others again.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.