HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Is heat treatment required after welding GD1 pipes, and what are the relevant standards?

2019-02-12View Original

Thread Content

The process pipelines involve welding of GD1 and GD2 pipes; I would like to ask whether heat treatment is required after welding, and what are the specific standards for this?
Reply #22019-02-12
Personally, I think GD1 requires heat treatment, as the need to handle extremely or highly aggressive media demands heat treatment
Reply #32019-02-12
1. GD1 and GD2 belong to power pipelines, and the **standard GBT32270** applicable to such pipelines is in its 2015 version. 2. The specifications contain provisions regarding heat treatment after welding: 2.1. Normative reference documents, such as the Welding Procedures for Thermal Power Plants; 2.2. Section 7.6 of the specifications deals specifically with heat treatment issues
Reply #42019-03-09
There are welding procedures for thermal power plants; go and take a look

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.