HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Pipeline calculation

2020-03-18View Original

Thread Content

Could you help calculate this? Originally, there was only one 4.5KW pump used to extract dichloromethane from the tank; now, 4 additional 2.4KW pumps are being used in parallel for extraction (although it’s possible that not all of them will be needed). By how much can the time required to empty the tank be reduced? The flow rate shown in the graph is the maximum flow rate. Mainly, how is it calculated?

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.