HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Pipeline layout issues related to fire protection codes

2021-12-14View Original

Thread Content

Code for Fire Protection Design of Petrochemical Industries 7.2.2: Piping for combustible gases, liquefied hydrocarbons, and combustible liquids shall not pass through buildings that are not related to them. Regarding this clause, if a pipeline carrying materials from the pipe gallery enters the tank area through the tank area’s dedicated pump room (an open-type one), then does this pipeline fall under the category related to the pump room?

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.