Issue of pipelines passing through firewalls

2025-05-12View Original

Thread Content

Article 6.1.5 of the Building Code prohibits combustible media from passing through firewalls. If a factory building is divided into Fire Zone A and Fire Zone B by a fire wall, and due to process requirements, the combustible fluid pipelines in Zone A need to lead to Zone B, is it possible to pass through the exterior wall from within a room to bypass the fire wall and reach Zone B?
Reply #22025-05-16
In reality, it’s a traversal, followed by sealing.
Reply #32025-05-17
Just go around it; as long as you don’t wear it.
Reply #42026-04-14
It’s possible; currently, they go around the exterior wall, which is usually a blast-resistant wall
Reply #52026-04-20
Generally, go around it. If passing through a wall is necessary, it is important to choose the right sealing material to prevent fire from spreading from one side to the other.
Reply #62026-04-30
The usual approach is to bypass the firewall and go back around outside the room

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.