Thread Content
Public bidding for high and low temperature molten salt steel pipes for the 200-megawatt solar thermal power generation project of CGN Qinghai Delingha Phase I
Purchase requirements: 1. This bidding is based on a fixed unit price; a provisional total amount is set, with settlement to be made according to the actual cost. Under the reverse bidding method, when submitting bids, suppliers must specify the unit price and total price, as well as the detailed configuration parameters of the product. The bid must cover all possible costs incurred before the product is delivered to the purchaser, including those related to manufacturing, transportation, loading and unloading, after-sales service, profits, taxes, and other such expenses; no additional fees will be charged to the supplier once the winning bidder is determined. If the unit price does not match the total price, the unit price shall prevail. 2. Delivery date: Tentatively scheduled for April 7, 2026. Subject to project notifications. 3. Delivery location: CGN’s 200-megawatt solar thermal project in the photovoltaic park, Delingha City, Qinghai Province. 4. Price requirements: The quoted price above represents the final cost upon delivery to the project site, and a 13% value-added tax invoice covering all costs including packaging, transportation, insurance, etc., shall be provided. The validity period of the quote shall not be later than 90 days. 5. Quality standards or requirements: Ensure that the goods undergo rigorous testing prior to being loaded and shipped, so that their quality, technical parameters, and performance meet the requirements specified in the contract; the product quality, specifications, and technical requirements shall conform to the **standards for such products. 6. Warranty period: Two years after the overall completion and handover of the project (see contract terms for details). 7. Principle for determining a successful deal: equal quality and service, along with the best price. Main qualification requirements for suppliers: 1. The supplier must have at least one record of selling products with similar or identical technical capabilities to those being purchased, over the past 3 years. 2. Joint bids are not accepted for this procurement. Procurement method: Reverse bidding will be used for this occasion. Timeline: 1. Time to obtain the bidding documents: Suppliers who meet the qualification requirements specified in this announcement and wish to participate should obtain the procurement documents by 17:00 on March 31, 2026 (Beijing time), via the \"PowerChina Procurement and Bidding Digital Platform\" (https://bid.powerchina.cn/index, hereinafter referred to as the \"Procurement Platform\"). 2. Deadline for submitting response documents (also referred to as the deadline for submitting quotes): Please submit your online quote through the procurement platform by 11:00 on April 1, 2026 (or any extended deadline), and upload a scanned PDF version of the signed and stamped response document, along with the editable WORD or EXCEL version of the same document in RAR or ZIP format, to the procurement platform. Medium for publishing the announcement: This tender announcement is published simultaneously on China Power Construction’s Sunshine Procurement Website (http://bid.powerchina.cn) and the China Public Service Platform for Bidding and Tendering (http://www.cebpubservice.com).
【Ten Years of Rapid Development in Chemical Engineering Equipment】3053–2026: China’s first 100-kilometer-long carbon dioxide transmission pipeline – the million-ton-level CCUS carbon dioxide pipeline in the Shengli Oilfield has been operating smoothly for 1,000 days. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5716490 (Source: Haichuan Chemical Industry Forum (HCBBS))
[Common Issues in Haichuan Pipeline Design] – A compilation post; images and text are being updated. Feel free to join the discussion: https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5705828 (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
【HaiChuan Safety Discussion】Compilation of Hidden Dangers Around Us – with pictures and texts; everyone is welcome to participate in the discussion: https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5705518 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Which party is responsible for designing the equipment lifting lugs: the design firm, the manufacturing firm, or the construction firm? https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5716586 (Source: Haichuan Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Equipment】China’s first 20,000-ton wet-process masterbatch production line was put into operation at Hei Mao in Jiangxi from 2039 to 2026. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5715864 (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
【Haichuan Chemical Technology Documentation】Case of leakage due to the use of 316L stainless steel pipes for transporting fresh water https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5716662 (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Equipment】3058-2026: Changzhou University makes breakthroughs in ethylene glycol hydrogenation refining technology; the world’s first upgrade project for converting light hydrocarbons into ethylene glycol is successfully commissioned. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5716686 (Source: Haichuan Chemical Industry Forum (HCBBS))
【HaiChuan Safety Discussion】Compilation of Hidden Dangers Around Us – with pictures and texts; everyone is welcome to participate in the discussion: https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5705518 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
【Haichuan Chemical Technology Documentation】Reasons for cracking of stainless steel flanges https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5716409 (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))