HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

When both a control valve and a check valve are installed on a pipeline, which one should be placed first and which one later?

2020-11-19 View Original

Thread Content

When both a control valve and a check valve are installed on a pipeline, which valve should be placed first and which one second? Please share your experience, thank you
Reply #2 2020-11-19
One-way valves are available with them in the front or at the back
Reply #3 2021-01-01
This has no impact; the lights I’ve seen are installed behind the control valve
Reply #4 2021-01-07
The function of a check valve is to prevent backflow; if it is intended solely to protect the control valve, it can be installed after the control valve, though this also depends on the specific circumstances

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.