HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Request for operating procedures for the first feed operation of an LNG vaporization station

2017-10-27View Original

Thread Content

The LNG terminal is starting up and undergoing its first feed-in operation; could anyone with experience provide some guidelines for carrying out this first feed-in? Thank you. Ps: I was only exposed to LPG before; this is my first time encountering LNG.
Reply #22017-10-27
Didn’t the design institute provide you with operating procedures? What’s found online is definitely not as good as what’s provided by design firms; after all, each situation requires a tailored approach
Reply #32017-10-27
Aren’t the operating procedures all written by the technical staff of one’s own company?
Reply #42017-10-27
The design firm has an operation manual. Then, based on this operation manual, you will create the operating procedures. How is it possible for the owner’s party to handle it on their own?
Reply #52017-10-27
These days, most design institutes are the entities that provide seals, right?

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.