The on-site safety inspection revealed that the installation of combustible gases was not in compliance with standards

2018-07-14View Original

Thread Content

On-site inspection revealed that the distance between some gas detectors and the surrounding equipment and pipelines was less than 0.5 m. In accordance with Article 6.1.3 of the standard GB50493-2009 \"Code for Design of Detection and Alarm Systems for Flammable and Toxic Gases in Petrochemical Industries\", there should be a clear distance of not less than 0.5 meters between the probe and the equipment or pipelines, as well as access passages ; If rectified in accordance with the specifications, the probe shall be installed on the fire escape ; I would like to ask the experts here ; How to explain it to the evaluation agency. Thank you
Reply #22018-07-14
Then proceed with the settings according to 4.2.1 and 4.2.2.
Reply #32018-07-14
smlx1978 Silly fool 〃 beach

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.