HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

What is the purpose of the two pipelines connecting the condensing turbine to the steam trap expansion tank?

2017-08-06View Original

Thread Content

The water condensed in the primary vacuum condenser is sent to the hydrophobic expansion tank through a water seal. At the start of operation, there is no water in the condenser; so how can water be poured into the U-tube? What is the purpose of this U-shaped water seal? The other stream is discharged to the drain through a steam trap! What is its use?
Reply #22017-08-07
The primary drain of the extraction pump is equipped with a U-tube, resulting in a lower pressure difference, while the secondary drain has a valve assembly, giving a higher pressure difference. Additionally, no water needs to be filled into the U-tube
Reply #32017-08-30
Okay, thank you. So what is the function of a first-grade hydrophobic U-shaped water seal?

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.