HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Recovery of thermal energy from high-temperature flue gases in boilers

2017-07-03View Original

Thread Content

I will cut off the bypass pipes of the two flue gas economizers. This is to prevent excessive flue gas resistance when the boiler is operating under high load. At the same time, a DN900 connecting pipe will be added to the inlet pipes of the two flue gas economizers, so that all the exhaust gases from either boiler can pass through these two economizers. May I ask the experts: is it necessary to submit an application for inspection for this modification?
Reply #22017-07-03
It’s not necessary if it doesn’t involve safety, energy conservation, or environmental protection.
Reply #32017-07-03
It’s not necessary if it doesn’t involve safety, energy conservation, or environmental protection.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.