HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Issues with the delayed calibration of safety accessories on pressure vessels?

2010-06-30View Original

Thread Content

Safety valves can have their inspection dates extended; what should be done with pressure gauges?
Reply #22010-06-30
When installing a pressure gauge, it is essential to install a shut-off valve in front of it. If that is not possible, we will conduct inspections during the downtime for maintenance of the equipment; adding a valve after that period is not allowed, especially for gauges installed on pressure vessels – a valve must always be used in such cases.
Reply #32010-07-01
We also have valves; even if they aren’t turned on or off very often throughout the year, there is still a high possibility of internal leakage.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.