Pressure testing sequence for lined containers

2017-12-05View Original

Thread Content

I would like to ask the experts: There is a piece of equipment that needs to have its interior lined with stainless steel plates. I want to know whether the hydraulic testing should be carried out before or after the lining is installed. In my opinion, performing hydraulic testing before lining violates the requirement that welding should not take place while there is pressure present; on the other hand, carrying out hydraulic testing after the lining is in place prevents it being possible to conduct pressure tests on the tank itself. I would appreciate hearing the experts’ opinions. Thank you
Reply #22017-12-05
Conduct a hydrostatic test after the lining is welded
Reply #32017-12-05
I haven’t done it before, but in my opinion, the lining should first undergo a pressure resistance test to ensure it passes, and then its sealing performance should be checked.
Reply #42017-12-05
The earliest repairs were carried out on-site, with several linings replaced; however, a brand new container has not been constructed yet. I’m not aware of any specific standards or requirements in this regard, but personally I think it’s necessary to first conduct a pressure test on the container to assess its strength, as the lining is only needed for corrosion protection.
Reply #52017-12-07
The lining is first tested for pressure resistance, and then a sealing test is conducted on it.
Reply #62017-12-12
According to the technical specifications of SINOPEC’s SEG for refining and chemical engineering projects, pressure vessels made of SS composite panels are subject to pressure testing after they have been manufactured; this presumably refers to the testing carried out after the lining has been applied
Reply #72017-12-12
According to the technical specifications of SINOPEC SEG, pressure vessels made of SS composite plates are subject to a pressure test after equipment fabrication, that is, a test after lining

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.