HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Issues regarding the selection of concrete floor surfaces and equipment foundation bolts

2018-12-08View Original

Thread Content

1. How to install vertical heat exchangers on concrete floors? What size hole should I leave for the equipment (if the equipment’s diameter is 500, should I choose Type C1 brackets)? How are the equipment brackets connected to the steel beams? Could the experts please offer some help? 2. The equipment manufacturer provides the number, material, and size of the bolts used for the tower; how can we determine what type of foundation bolts to use? How long is the bolt?
Reply #22018-12-09
Refer to this post for the method of connecting the bottom plate of the container ear-type support to the steel structure: https://bbs.hcbbs.com/thread-2168792-1-1.html (Source: Haichuan Chemical Industry Forum)

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.