HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Is it necessary to go through notification procedures for pressure vessels welded on-site by users?

2019-09-11View Original

Thread Content

The tower sections manufactured by our company are shipped to the location where the equipment will be used, where the equipment is assembled and welded on-site. Is it necessary to submit a notification prior to this assembly and welding process? Should we simply invite the appropriate inspection agency to conduct the inspection?
Reply #22019-09-11
It is necessary to provide notification; generally, it is the construction and manufacturing unit that provides such notification
Reply #32019-09-11
1. Notification is required, and generally, it is the construction and manufacturing unit that handles this notification. 2. It should be handled according to the actual situation: Our company takes care of all the procedures on behalf of the construction parties, ensuring fast processing and no cost involved. Reason: The cost for the construction party to handle this is high, and they may also have to treat people to meals. Remember that \"the cost comes from the sheep\" – all expenses will be reflected in the pricing. I hope this can help you.
Reply #42019-09-11
It is needed. To be handled by the installation unit.
Reply #52019-09-12
If it’s not being installed by oneself, it’s best to have the inspection officer from the place of manufacture go to the welding site, to save trouble
Reply #62019-09-16
The construction unit needs to complete the notification process first
Reply #72019-09-21
Pressure vessels that have completed the final circumferential weld at the construction site must go through notification procedures at the construction site before supervision and inspection can be arranged.
Reply #82019-09-23
Notification is required; the construction and manufacturing unit must handle the notification at the local geological supervision bureau
Reply #92019-09-23
Notification is required; the construction and manufacturing unit must handle the notification at the local geological supervision bureau

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.