Is the drawing of the manhole in the front view of the compressed air storage tank incorrect?

2020-12-07View Original

Thread Content

This post was last edited by hopelu on 2020-12-7 at 18:39. Question: Is there an error in the way the manhole on the front view of a compressed air storage tank used in chemical equipment is drawn? Thank you!
Reply #22020-12-07
Chemical plant equipment diagrams are drawn this way, with the position of the pipe ends indicated in a top view or a diagram showing the positions of those pipe ends.
Reply #32020-12-07
This post was last edited by hopelu on 2020-12-7 at 18:36. This diagram makes it clear to the reviewers that the manhole should be drawn in the center of the front view.
Reply #42020-12-07
This post was last edited by hopelu on 2020-12-7 at 18:38. How to draw a schematic diagram?
Reply #52020-12-07
I’ve heard this expression for the first time; I guess he wants to see the direction in which the manhole opens from the main view, but that can also be seen from the top view
Reply #62020-12-07
The elevation of the manhole is indicated on the front view, while the orientation is shown in the top view; it’s fine to draw it in the middle as well. Perhaps they think it’s necessary to show the relationship between the views, but I don’t think it’s necessary:lol
Reply #72020-12-07
They are right; the positions of the manholes on your front view/top view do not correspond.
Reply #82020-12-07
Drawing methods in the Department of Chemical Engineering and those in the Department of Mechanical Engineering
Reply #92020-12-07
Regulators are complete laymen; it’s fine to draw it this way
Reply #102020-12-07
Agree with you: lol. For some equipment that has several or a dozen pipe openings at the same elevation, it is standard practice to draw one diagram of the pipe opening on the side view and list all the pipe opening numbers there. According to the above regulatory requirements, it’s necessary to show everything on the main view – that’s completely absurd, right?:L

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.