English abbreviations related to design and project management: 1. Common abbreviations for project management approaches: IPMT: Integrated Project Management Team (Integrated Project Management Group). Integration refers to the integration of the organizational structures of the project owner and the project management contractor (abbreviated as PMC), the integration of the project procedures, the integration of design, procurement, and construction, as well as the integration of the goals and values of all parties involved in project management. “In “integration,” priority should be given to ensuring the cultural compatibility among all parties involved, including the owner and the project management company, so that their core values align and complement each other, thereby establishing a set of core values and unified project goals for the integrated project management team. Common core values and goals inspire every participant to take an active role and contribute the knowledge, experience, and skills necessary to ensure the success of the project. PMC: Project Management Contract refers to the practice where the project owner hires a company – usually an engineering or consulting firm with sufficient capabilities – to manage the entire project on behalf of the owner. This company is known as the “Project Management Contractor” (abbreviated as PMC) in the context of the project. When using this model to manage a project, the client only needs to retain a small team for infrastructure management to make decisions on key issues, while the bulk of the project management tasks are handled by the project management contractor. EPC: Engineering, Procurement, Construction (design-procurement-construction (EPC)/turnkey project contracting). EP: Design and procurement contracting, meaning that the contractor is responsible for the design and procurement aspects of the project, while construction is carried out by another contractor. PC: Procurement-Construction General Contracting; EP+CM: Design-Procurement-Construction Management General Contracting; MFA: Multi-Facility (purchase) Agreement – Agreement for large-scale procurement; MR: Material Requisition – Request for payment/order for materials; MTO: Material Take-Off – List of materials required; PO: Procurement Order – Order to purchase materials; FCN: Field Change Notice – Notification of changes on site; CN: Conference Note – Minutes of a meeting; MC: Mechanical Completion – Completion of mechanical work. 2. Acronyms related to design: FEED: Front End Engineering Design – Preliminary engineering design, situated between basic design and detailed design in domestic projects. FEL: Front End Loading (preliminary design). FSR: Feasibility Study Report (Report on Feasibility Studies). HAZOP: Hazard and Operability Study (Study of hazards and operability). BDEP: Basic Design Engineering Package (basic design package). IFA: Issued for Bid (invitation for bidding). ITB: Invitation to Bid (bid invitation). HVAC: Heating, Ventilation and Air Conditioning (heating and ventilation systems). Iso: Piping Isometric Drawing (single-line diagram). P&ID: Process and Instrumentation Diagram (diagram of process processes and instruments). PEFS: Process Engineering Flow Scheme (process design flow diagram).
FEED: Front End Engineering Design (preliminary engineering design: situated between basic design and detailed design in domestic contexts). ----Explanation error. FEED----Front-end engineering design, with a depth that lies between domestic feasibility studies and basic design. After the FEED stage is completed, CDI is required to carry out the basic design in accordance with domestic standards.