Progress on the construction of the 1 million-ton-per-year methanol production plant using syngas from China Coal Hubei Energy Chemicals

2019-10-09View Original

Thread Content

Progress in the construction of China Coal EnerTech’s project to produce 1 million tons of methanol per year from syngas Author/Source: Coal Chemical Industry 114 Forum Date: October 7, 2019 Page views: 117 On September 26, 2019, the on-site fabrication tasks for the air cooling tower and water cooling tower of the air separation unit in China Coal EnerTech’s project to produce 1 million tons of methanol per year from syngas were successfully completed. On July 22, material pouring for the air-cooled towers and water-cooled towers began, marking the start of the on-site manufacturing phase. On September 23, pressure testing of the air-cooled tower began; on September 25, the pressure testing was successful. On September 26, the painting work on both the air-cooled and water-cooled towers was completed, marking the finish of their on-site construction. The manufacturing of this equipment has played a positive role in promoting the construction of air separation plants. On September 28, at 11:17 a.m., the lifting of the first large-scale piece of equipment—the waste heat recovery unit—for the Gasification and Purification section of the Methanol Project undertaken by Sinochem Second Construction Company for China Coal Energy & Chemical Industry Group began. The unit stands 20.5 meters tall and weighs 98.5 tons. A 400-ton crawler crane was used as the main lifting device, while a 135-ton crawler crane served as the auxiliary crane. The top-lifting method was employed to raise the unit to a height of 45.4 meters. Given the high level of difficulty involved in this operation, the equipment had to be maneuvered through a concrete framework with a complex structure. The China National Coal Group EnerTech project, with an annual production capacity of 2 million tons of ammonia and 3.5 million tons of urea, is located in the Tuk Industrial Park within the Sulige Economic Development Zone in Uxin Banner. Construction was carried out in two phases. The first phase, involving the production of 1 million tons of ammonia and 1.75 million tons of urea per year, includes two air separation units with a capacity of 40,000 Nm3/h each; these units were completed and put into operation in 2013. Additionally, some of the utilities required for the second phase, as well as all office and living facilities, have also been constructed. Based on the current market conditions and operational status, Phase II of the project plans to shift from producing synthetic ammonia and urea to manufacturing 1 million tons of methanol, thereby supplying MTO-grade methanol feedstock to the olefin plants of China Coal Mengda Company.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.