Thread Content
On March 8, 2026, the boiler firing-up work for Boiler No. 1 in the company’s gas production project aimed at improving energy efficiency and environmental protection, as well as related renovation works, was officially launched, marking the full entry of the project’s commissioning phase into its critical implementation stage. In Shanxi Jinfeng Coal Chemical Gasification, efforts will be made to improve energy efficiency and environmental protection; 12 pure oxygen continuous gasification units (10 in operation and 2 as backups) will be installed to replace the existing 32 fixed-bed intermittent gasification units. A new air separation unit with a capacity of 30,000 m3/h will also be built, and the gas purification systems as well as the zero-discharge wastewater treatment system across the entire plant will be upgraded. After the project is implemented, the overall production capacity remains unchanged, at 360,000 tons of amino alcohol and 520,000 tons of urea per year.
【HaiChuan Safety Discussion】Hidden Dangers Around Us – Eyewash Stations with a Water Outlet Height of Less than 15 cm https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5715076 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
【3D Process Flow】Summary Post -- Reverse Micelle Extraction Process Flow https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5715058 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Processing Equipment】The first fully electrically driven pyrolysis gas compressor in China was successfully tested at the Tarim Phase II ethylene project of Dushanzi Petrochemical Company. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5714974 (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Equipment】3033–2026: China’s first 10,000-tonne-per-year demonstration production line for the fiberization of coal-based solid waste goes into trial operation https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5715051 (Source: Haichuan Chemical Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Equipment】3033–2026: China’s first 10,000-tonne-per-year demonstration production line for the fiberization of coal-based solid waste goes into trial operation https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5715051 (Source: Haichuan Chemical Forum (HCBBS))
【3D Process Flow】Summary Post – Useful for learning about the process flow: https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5711616 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Engineering Equipment】3037-2026: China’s first independently designed and built large-scale integrated fracturing engineering vessel, the “Ocean Oil 696”, was delivered in Zhoushan, Zhejiang. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5715229 (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Equipment】3038=2026: Shandong Energy’s independently developed aldehyde-based fragrance project fills a technical gap in China, reducing reliance on imports! https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5715785 (Source: Haichuan Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Equipment】From 2030 to 2026, Tianhua Institute successfully designed and manufactured G5 electronic-grade isopropanol production equipment, which was then applied in CNPC’s first high-end electronic-grade IPA production system. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5715928 (Source: Haichuan Chemical Forum (HCBBS))