The expansion project for 700,000 tons of synthetic ammonia at the Yingcheng facility in Hubei, the 1 million-ton compound fertilizer project, along with the 475,900-ton urea solution production unit with a 95% concentration, have commenced trial production and are now operating at full capacity

2026-05-09View Original

Thread Content

In April 2026, when Chengdu Yuntu Holding was surveyed by 49 institutions including Shenwan Hongyuan Securities, the company stated that its expansion project for a synthetic ammonia production capacity of 700,000 tons at its base in Yingcheng, Hubei, as well as its 1-million-ton compound fertilizer production project and the associated 475,900-ton urea solution production facility with 95% concentration, had already started trial production and were operating at full capacity. According to Sinochem Third Construction, during the May Day holiday, the various phases of the No. 2 urea production unit at the Yingcheng Xindu Chemical Project in Jiangsu Province were advanced in an orderly manner. The various construction teams worked closely together, advancing the remaining completion tasks steadily while ensuring safety and quality, so as to successfully reach the key milestones in the plant’s water testing phase and lay a solid foundation for the subsequent full commissioning of the plant. At present, 98% of the pipeline welding has been completed; the pipelines are undergoing hydrostatic testing. Equipment installation is 100% finished, as is the installation of custom-made storage tanks. Steel structure installation is 97% complete, and 220,000 meters of electrical and instrumentation cables have been laid; motor testing is currently in progress. According to East Money Network, the first phase of Yingcheng Xindu Chemical’s production facility has a capacity of 520,000 tons of urea, while the second phase, with a capacity of 500,000 tons, is scheduled to be completed in the second quarter of 2026. Yingcheng Xindu Chemical uses a Jinhua-type boiler with water-cooled wall and waste-boiler gasification technology, along with a carbon dioxide stripping urea production process. The ammonia/urea plant will come online in March 2026.
Reply #22026-05-09
【HaiChuan Chemical Construction Technology】Continuously updated summary thread–Learn construction techniques to build chemical engineering projects successfully https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5719396 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #32026-05-09
【Haichuan Teahouse】Unassuming in appearance, but absolutely delicious! The wonderfully “ugly” delicacies of Chaoshan in spring! https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5720078 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
Reply #42026-05-09
【In-depth Discussion on HaiChuan’s Modular Installation】--What about modular steam (hot water) distribution plates? https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5720079 (Source: HaiChuan Chemical Industry Forum (Hua HaiChuan Liu hcbbs))
Reply #52026-05-10
【Haichuan Teahouse】Steamed Pork with Salted Fish – A Home-style Flavor Deeply Rooted in the Soul of Guangdong People https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5720135 (Source: Haichuan Chemicals Forum (Hua Haichuan Liu hcbbs))
Reply #62026-05-10
【Haichuan Illustrated Chemical Equipment】 Series Posts -- Thermal Siphon Reboiler https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5720142 (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
Reply #72026-05-11
【Common Issues in Haichuan Pipeline Design】--The rupture disc is not installed within 5 times the pipe diameter from the inlet side of the safety valve. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5720226 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
Reply #82026-05-12
【Ten Years of Rapid Development in Chemical Equipment】3109-2026: Proprietary Technology! CPC for the cracking furnace area of the ethylene plant in Tarim’s 1.2 million tons/year Phase II ethylene project https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5719713 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
Reply #92026-05-13
【3D Process Flow】Coal chemical processing technologies and key equipment https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5720380 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
Reply #102026-05-13
【Safety Management and Standardization of Special Equipment】In-depth on-site inspection of lifting machinery: Have you checked all these 20 key inspection points? https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5720426 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.