Call for bids for EPC general contracting of the 100MW hybrid photovoltaic power generation project in Weibin, Tang Dynasty!

2025-11-22View Original

Thread Content

On November 20, the tender announcement for the EPC general contracting of the 100MW hybrid photovoltaic power generation project at Datang Weibin (Shaanxi Company) was released; the project owner is Datang Baoji No. 2 Power Generation Co., Ltd. The announcement states that the project is located in Gaojia Town, Weibin District, Baoji City, Shaanxi Province, with a capacity of 100MW. The scope of the bidding includes the design of construction drawings for the photovoltaic plant, the collection lines, and the 110kV step-up substation (excluding the transmission lines), as well as the preparation of as-built drawings. It also covers the procurement of equipment and materials (except for those supplied by the contractor).
Reply #22025-11-23
【Ten Years of Rapid Development in Chemical Engineering Equipment】2842-2025 **The research on ‘Key Technologies for Surface Treatment of Storage Tanks in Pipeline Systems, as well as the Development and Industrial Application of Intelligent Maintenance Systems’ has been evaluated as being at an internationally leading level** https://bbs.hcbbs.com/thread-5705865-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #32025-11-23
【Ten Years of Rapid Development in Chemical Engineering Equipment】2842-2025 **The research on ‘Key Technologies for Surface Treatment of Storage Tanks in Pipeline Systems, as well as the Development and Industrial Application of Intelligent Maintenance Systems’ has been evaluated as being at an internationally leading level** https://bbs.hcbbs.com/thread-5705865-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #42025-11-23
【HaiChuan Safety Discussion】Compilation of Hidden Dangers Around Us – with images and text; everyone is welcome to join the discussion: https://bbs.hcbbs.com/thread-5705518-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #52025-11-23
【Ten Years of Rapid Development in Chemical Equipment】The world’s largest seamless steel pipe production line, 2843-2025, was officially put into operation at Shandong Guangfu Group. https://bbs.hcbbs.com/thread-5705991-1-1.html (Source: Haichuan Chemical Forum (HCBBS))
Reply #62025-11-23
【Ten Years of Rapid Development in Chemical Engineering Equipment】2844-2025: China’s first project for generating electricity from the residual pressure of high-pressure natural gas transmission pipelines – the Haimen Station natural gas residual pressure power generation project – has been put into operation in Nantong, Jiangsu. https://bbs.hcbbs.com/thread-5706004-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #72025-11-23
【Ten Years of Rapid Development in Chemical Engineering Equipment】The 2845-2025 2MW/600℃ ultra-high temperature heat pump energy storage demonstration project was successfully commissioned on its first attempt. https://bbs.hcbbs.com/thread-5706020-1-1.html (Source: Haichuan Chemical Engineering Forum (Hua Haichuan Liu hcbbs))
Reply #82025-11-24
【Ten Years of Rapid Development in Chemical Engineering Equipment】The 2845-2025 2MW/600℃ ultra-high temperature heat pump energy storage demonstration project was successfully commissioned on its first attempt. https://bbs.hcbbs.com/thread-5706020-1-1.html (Source: Haichuan Chemical Engineering Forum (Hua Haichuan Liu hcbbs))
Reply #92025-11-24
【Ten Years of Rapid Development in Chemical Engineering Equipment】SINOPEC’s Research Institute of Petrochemistry’s high-efficiency catalytic cracking (RTC) technology was tested and validated at Zhenhai Refining & Chemical Complex from 2023 to 2025. https://bbs.hcbbs.com/thread-5705591-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #102025-11-24
【Ten Years of Rapid Development in Chemical Equipment】2847-2025: The first domestically produced million-ton-class methanol synthesis reactor passed the factory acceptance test https://bbs.hcbbs.com/thread-5706030-1-1.html (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
Reply #112025-11-25
【Ten Years of Rapid Development in Chemical Equipment】2847-2025: The first domestically produced million-ton-class methanol synthesis reactor passed the factory acceptance test https://bbs.hcbbs.com/thread-5706030-1-1.html (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.