HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

In the process unit area, the flare gas liquid separation tank should be located away from other process equipment in the facility

2018-09-03View Original

Thread Content

There is a sentence on page 85 of “Industrial Pipeline Layout Design and Engineering Applications” – is it reasonable?
Reply #22018-09-03
I’m not sure what this phrase is supposed to convey according to the standards The layout of the torches typically takes into account a 90-m fire separation distance, which is already quite far.
Reply #32018-09-03
That makes sense; the flare gas liquid separation tank is at some distance from the flare, and it’s necessary to ensure that this separation tank is also kept away from other process equipment
Reply #42018-09-04
The flare gas separation tank should be located far away from the process plant area and process equipment. When designing it, attention is paid to the wind direction in the location of the factory; a fire protection distance of around 90 meters as specified for flares ensures that production safety in the factory is not compromised.
Reply #52018-09-06
Some flare gas liquid separation tanks are located near the BL line in the plant area or under utility tunnels; according to the specifications, such liquid separation tanks that are situated near the BL line in the plant area or under utility tunnels must be kept at a distance from other process equipment in the plant.
Reply #62018-09-07
This post was last edited by The wise are enlightened on 2018-9-7 14:34. su*ubin: Are there any regulatory requirements? Answer: Industrial Pipeline Layout Design and Engineering Applications.
Reply #72018-09-10
Much of the design experience comes from the insights of those who came before, and it isn’t necessary to confirm everything through standards such as GB and HGT. If standardization is necessary, you can refer to API STD 521 Pressure-Relieving and Depressuring Systems 6th Edition_2014y, section 4.3.14 Plant Fires.
Reply #82019-11-25
It is specified in China’s standard \"Design and Engineering Applications for Industrial Pipeline Installation\" as well as in the foreign standard API STD 521
Reply #92022-11-28
I checked API521, version 6, but couldn’t find clause 4.3.14

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.