Thread Content
This post was last edited by kareale88 on 2019-3-27 at 13:12. File: bg4.png 【Daily Question】 【Static Equipment Discussion Forum...Question No. 86】 March 27, 2019. Modified multiple-choice questions...Everything is going well. .............................................................. The question is taken from the standard NB/T 47041-2014 «Tower-Type Containers». Please point out any inaccuracies in the modifications; if you have any good suggestions, feel free to reply with them – rewards will be given generously. ........................................................................... Answers (multiple choice, multiple choice, multiple choice) please fill in in order. Reward rules: 1 wealth for participation, 3 wealth for each correct answer, up to a maximum of 10 wealth. ........................................................................... 1. The manufacturing unit shall carry out production in accordance with the requirements of the design documents. If modifications to the original design are necessary, written approval from ( ) for such modifications must be obtained, and the altered parts must be documented. A. Using customers ; B、Original design unit ; C. Reviewer ; --------------------- 2. The manufacturing unit shall develop a comprehensive quality plan prior to the production of tower-type containers; this plan should include, at a minimum, the manufacturing processes for the tower-type containers or their components, the control points, the inspection items, and the acceptance criteria. () A、Correct ; B. Incorrect ; --------------------- 3. The inspection department of the manufacturing unit shall, during the manufacturing process and after completion of the tower vessel, conduct various inspections and tests on the tower vessel in accordance with the provisions of these standards and design documents, issue corresponding reports, and be responsible for the accuracy and completeness of such reports. () A、Correct ; B. Incorrect ; --------------------- Answer 1: B (Original text: 4.1.4.1 The manufacturer shall carry out production in accordance with the requirements of the design documents. If modifications to the original design are necessary, written consent from the original design unit for such modifications must be obtained, and the altered parts must be documented. ) 2, A 3, A