HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Sharing of pipeline numbering and labeling rules.

2019-07-23View Original

Thread Content

For the pipeline between two devices, regardless of whether its specifications or dimensions change, only one pipeline number is assigned; if there are pipelines branching off to other devices or pipelines in between, then separate pipeline numbers are assigned. For the venting and drainage of equipment, pipeline numbers must be assigned to any pipeline present. In the absence of a main pipe, a pipe number is assigned to the pipe leading to the farthest device with the same tag number, while the remaining pipes are given separate pipe numbers. Bypass pipes that connect two pipelines (not those of control valves), bypass pipes at the inlet and outlet of safety valves, as well as return pipes for equipment and pipelines, all require pipeline numbering.
Reply #22019-07-24
Which manual is the original poster referring to? In my previous company, for some small cross-connects, as well as for systems used for draining condensate and waste, pipe numbers were not assigned; instead, only the pipe diameter was indicated

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.