HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Station setup for the SIS system

2019-06-29View Original

Thread Content

Referring to the standard GB/T 50770-2013 regarding operator stations, engineer stations, and time-sequencing recording stations, it specifies that an engineer station and a time-sequencing recording station can share the same device, but it does not clearly state whether it is possible to have all three functions – operator, engineer, and time-sequencing recording – in one single device. Since some devices have very few points, is it necessary to separate the operator station from the engineer station?
Reply #22019-06-29
10.1.3 The operator station shall not modify the application software of the safety instrumented system. Can’t it be a three-in-one just because of this?

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.