HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

IO point table

2021-09-26View Original

Thread Content

Does anyone know what these point table names mean?
Reply #22021-09-26
There isn’t enough information; what kind of document does this table belong to?
Reply #32021-09-26
AI has a total of 96 points, with 62 points in actual use and 34 points as reserves; the percentage of reserve points is 55%. Similar for the others
Reply #42021-09-26
A general overview of the I/O points available in the system, as well as their status regarding usage and availability: NO. – Sequence number; SIGNAL (TYPE) – Type of signal; AVAILABLE PTS – Number of available points (channels that can be provided by the I/O cards); USED PTS – Number of points already in use (channels occupied by connections); SPARE PTS – Number of spare points; SPARE PECENT – Percentage of spare points
Reply #52021-09-26
Doesn’t that mean it’s an available point? In other words, you have a total of 96 AI channels, 62 of which are in use and 34 are reserved, giving a reserve rate of 55%
Reply #62021-09-27
Is this I/O list prepared for querying a PLC or a DCS?

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.