Can a pipeline pump be used to address pipeline blockages caused by the long length of the outlet pipe in a tar processing tubular furnace?

2018-02-04View Original

Thread Content

This post was last edited by liaifeng on 2018-8-4 at 18:32. In our plant, the distance from the outlet of the tar tubular furnace used for tar processing to the distillation tower is nearly 180 meters. Due to this long distance, slag formation often occurs in the tubular furnace. After analysis, we now adopt the approach of shutting down the furnace periodically for cleaning. Is it possible to install a pipeline pump at the outlet of the tubular furnace’s pipeline to address the issue of pipe blockages? Is this a viable solution?
Reply #22018-02-07
It’s not very feasible; however, the heating temperature of the furnace can be reduced to lower the tower pressure
Reply #32018-02-13
Medium-pressure steam can be introduced at the inlet
Reply #42018-08-04
Even if you add a pump, won’t these impurities or coke be carried into the tower? First, you need to figure out whether these impurities are caused by high furnace temperatures or by an excessive amount of impurities already present. Only by identifying the cause can appropriate measures be taken!
Reply #52018-08-09
This post was last edited by hflfs on 2018-8-9 at 20:23. The reason is the long length of the pipeline; in order to avoid high-voltage lines, its length exceeded the designed value by a great deal, with the outlet pipeline of the tubular furnace being nearly 170 meters long.
Reply #62018-08-09
Based on the clues you provided, it is caused by impurity deposition due to an overly long process and slow flow rate! However, impurities must be filtered out before they enter the tower; otherwise, they will still be carried into the tower and cause fluctuations in its operation!
Reply #72018-08-12
Yes, in our current production process, the pipes are heated once a month and replaced every three months to prevent blockages and slag formation in the tubular furnace tubes.
Reply #82018-08-16
You’re using the old manufacturing process here; we used to burn tubes as well, but we changed the process later, and now the tubes don’t get clogged anymore

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.