Thread Content
Sinochem Second Construction won the bid for the project at Shanxi Meijin Huasheng Chemical New Materials Company, which involves the production of 300,000 tons per year of ethylene glycol along with LNG from comprehensive waste gases. Author/Source: Sinochem Second Construction; Date: 2019-08-16; Clicks: 48. On August 9, Sinochem Second Construction’s subsidiary won the bid for the first phase of construction and installation work related to this project. The project is EPC-general contracted by Donghua Engineering Technology Co., Ltd. On April 22, Donghua Technology issued a announcement regarding the signing of the PC (procurement and construction) general contract as well as the PMC project management contract for the project aimed at producing 300,000 tons per year of ethylene glycol from comprehensive exhaust gases, at Shanxi Meijin Huasheng Chemical New Materials Co., Ltd. I. Overview of Contract Signing On April 19, 2019, Donghua Engineering Technology Co., Ltd. (hereinafter referred to as “the Company”) and Shanxi Meijin Huasheng Chemical New Materials Co., Ltd. (hereinafter referred to as “Meijin Huasheng” or “the Client”) signed in Qingxu, Shanxi, the “PC (Procurement and Construction) General Contract for the Project of Producing 300,000 tons per year of ethylene glycol from comprehensive waste gas, along with LNG production, at Shanxi Meijin Huasheng Chemical New Materials Co., Ltd.” (hereinafter referred to as the “General Contract”) as well as the “PMC Project Management Contract for the Project of Producing 300,000 tons per year of ethylene glycol from comprehensive waste gas, along with LNG production, at Shanxi Meijin Huasheng Chemical New Materials Co., Ltd.” (hereinafter referred to as the “PMC Contract”), both of which came into effect officially.