Progress of Beikong Ordos’ 4 billion cubic meter coal-to-natural gas project

2019-09-08View Original

Thread Content

Progress of Beikong Ordos’ 4 billion cubic meter coal-to-natural gas project Author/Source: People’s Government of Ordos City Date: 2019-09-04 Clicks: 78 The Beikong Ordos coal-to-natural gas project, with a total investment of 23.26 billion yuan, received approval from the National Development and Reform Commission on May 16, 2017; construction began on September 15 of the same year, and the groundbreaking ceremony was held on May 9, 2019. The project covers an area of 3,935.1 mu and utilizes advanced pressurized coal gasification and pressurized pulverized coal gasification technologies. Using coal as raw material, it goes through processes of gasification, shift reaction, and purification, followed by methanation to produce natural gas. This gas is then pressurized and dehydrated at the first processing station before being transported via natural gas transmission pipelines to end-users. Upon reaching full production capacity, the project will generate an annual output value of 6.344 billion yuan and profits and taxes of 1.65 billion yuan. In 2019, it is planned to complete investments of 300 million yuan. To date, the geological surveys and land-related procedures for the area in front of the factory have been completed. Land grading work in that area began on August 8, with completion of the grading expected by mid-September; the construction of the fence and some supporting facilities is scheduled to be finished by the end of October. The design work is underway for the office building, cafeteria, sports and cultural center, and dormitory buildings in the factory area; the tendering process for the overall construction is scheduled to be completed by the end of the year.
Reply #22019-09-08
There’s a lot of thunder but little rain; could those who are familiar with the situation please update us on the progress of the process package?
Reply #32019-09-09
It has a somewhat symbolic image of work starting; as the weather gets colder in October, everyone leaves.
Reply #42019-09-10
Latest Progress on BEIKE Energy’s Coal-to-Natural Gas Project in Ordos / Author/Source: Coal Chemical Industry 114 Forum / Date: 2019-09-04 / Clicks: 64. Recent news indicates that Beijing BEIKE Energy Investment Co., Ltd. (hereinafter referred to as “BEIKE Energy”) plans to invest 300 million yuan in its 4 billion cubic meter coal-to-natural gas project in Ordos during 2019. To date, the geological survey of the area in front of the factory and the necessary land procedures have been completed. Land grading in the area in front of the factory began on August 8, with completion of the grading scheduled for mid-September. Completion of the construction of the wall and some supporting facilities is expected by the end of October. The office building, cafeteria, sports and cultural center, and dormitory buildings in the area in front of the factory are currently under design, with the intention to complete the tendering process for the general contract by the end of the year. The Beikong Energy Ordos coal-to-natural gas project is located in the Dali Industrial Park, Zhungeer Banner, Ordos City, Inner Mongolia Autonomous Region. Utilizing local coal resources and employing technologies such as pressurized gasification of crushed coal, pressurized gasification of pulverized coal, and methanation, it produces 4 billion standard cubic meters of synthetic natural gas per year. It mainly supplies cities in Beijing and its surrounding areas, while also ensuring the replacement of clean energy in Zhungeer Banner. The total investment amounts to 23.26 billion yuan. Construction contents: (1) Main project: 1 fixed-bed coal gasification under pressure production line, including units for coal gasification, phenol-ammonia recovery, shift reaction, low-temperature methanol washing, and methanation ; 3 fluidized bed coal gasification production lines, including units for coal gasification, shift reaction, low-temperature methanol washing, and methanation ; Air separation, coal preparation, sulfur recovery units, etc. (2) Auxiliary facilities: boiler rooms, storage and transportation systems, coal yards and coal depots, desalination stations, etc. (3) Environmental protection projects: sewage treatment, reclaimed water treatment, brine treatment, evaporation crystallization units, flare systems, hazardous waste temporary storage areas, etc. The main product of this project is 4 billion standard cubic meters per year of synthetic natural gas, along with by-products such as crude oil, tar, naphtha, sulfur, liquid ammonia, ammonium sulfate, crude phenol, industrial sodium chloride, and industrial sodium sulfate. Further reading: On April 13, 2015, the Yellow River Water Resources Commission under the Ministry of Water Resources approved the \"Water Resources Assessment Report for the 4 billion cubic meters per year coal-to-natural gas project of Inner Mongolia Beikong Jingtai Energy Development Co., Ltd.\" via document No. Huangshui Tiao [2015] 119. On April 25, 2016, the Environmental Impact Assessment Report for Inner Mongolia Beikong Jingtai Energy Development Co., Ltd.’s 4 billion Nm3/year coal-to-natural gas project was approved by the Ministry of Environmental Protection. Circular Review No. 52. On May 16, 2017, the National Development and Reform Commission issued the “Reply of the National Development and Reform Commission on the Approval of the Demonstration Project for Producing 4 billion standard cubic meters of coal-derived natural gas per year by Inner Mongolia Beikong Jingtai Energy Development Co., Ltd.”, Document No. FGNY [2017] 942. On May 17, Beikong Jingtai Energy received the official approval document. On May 9, 2019, the groundbreaking ceremony for Beikong Ordos’ 4 billion cubic meter coal-to-natural gas project in the spring of 2019 was held at Dali Industrial Park. Company Overview: Beijing Holding Group Co., Ltd. (hereinafter referred to as “Beijing Holding Group”) was established in January 2005. It is a state-owned holding group funded by the people of Beijing, engaging in operations in both domestic and international markets, as well as in industrial activities and capital management. Beikong Energy is a wholly-owned subsidiary of Beijing Holding Group. Based on the development and application of coal-to-natural gas technology, it is a specialized company engaged in the investment, development, and operation of clean energy projects. Beikong Energy was registered and established on January 24, 2013. To meet the capital’s strategic needs for clean energy and to implement the development strategy of Beijing Enterprises Group, BE Energy focuses on project investment and operation management in the field of clean energy development, building on the exploration and application of coal-to-natural gas technology. Inner Mongolia Beikong Jingtai Energy Development Co., Ltd. was established in September 2010 to build a coal-to-gas plant with a capacity of 4 billion cubic meters, along with associated long-distance pipeline projects, in the Dalu Industrial Park in Zhungeer Banner, Ordos City.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.