Thread Content
The energy-saving report for the clean and efficient coal-to-gas comprehensive utilization project of Gansu Jingyuan Coal and Electricity Co., Ltd. was approved by the provincial development and reform commission. Author/Source: Baiyin Evening News; Date: 2019-12-11; Clicks: 106. On December 5, the energy-saving report for this project was approved by the relevant provincial authority. It is reported that the group will take advantage of the city’s strong industrial foundation and strategic location to invest 5.157 billion yuan in building a comprehensive project for the clean and efficient utilization of coal gas at the Yindong Industrial Park in the Baiyin High-Tech Zone. The reporter learned that the project will be implemented in two phases; the first phase is scheduled to be ready for construction by the end of 2019, with operations set to begin by the end of 2021 ; The construction period for the second phase is planned to be two years. At present, the project has completed the preliminary tasks such as registration, geological surveys, safety assessment reviews, and preparation of environmental impact reports; other tasks such as land acquisition and water resource evaluations are currently in progress. Upon completion of the project, it will be possible to convert approximately 1.8 million tons of raw coal annually on-site. This will enable annual production of 700,000 tons of urea, 100,000 tons of methanol, 216 million Nm3 of (CO+H2), 60,000 tons of melamine, 50,000 tons of urea solution, and 50,000 tons of food-grade liquid CO2. In addition, products such as liquid oxygen, liquid nitrogen, liquid argon, and catalysts will also be produced. The project is expected to generate annual sales revenue of 2.733 billion yuan, a profit of 667 million yuan, and total tax revenues of 747 million yuan. A responsible official from the Municipal Development and Reform Commission said that in the next step, they will, in accordance with the relevant requirements regarding the \"dual control\" of energy consumption set by the provincial and municipal authorities, further strengthen oversight of energy consumption in projects. They will urge the project owners to thoroughly implement the review recommendations and relevant energy-saving measures, so as to ensure that the annual energy consumption targets as well as those set for the 13th Five-Year Plan are met.