Thread Content
Disclosure of Environmental Impact Assessment Information for the Gasification Upgrade Project in the Bagong Park of Shanxi Lanhua Tianxin New Energy Chemical Co., Ltd. Author/Source: Shanxi Lanhua Technology Entrepreneurship Co., Ltd. Date: 2020-03-05 Views: 21 I. Project Overview In order to actively comply with relevant policies and environmental protection requirements, Shanxi Lanhua Technology Entrepreneurship Co., Ltd. and Shanxi Tianze Coal Chemical Group Co., Ltd. jointly established Shanxi Lanhua Tianxin New Energy Chemical Co., Ltd. The company plans to carry out a gasification upgrade project in the Bagong Park; it intends to utilize the two existing GSP gasification furnaces owned by the Lanhua Group, and to add another Shenning furnace as well. Advanced coal gasification technologies will be used to replace the existing fixed-bed gas generation furnaces, thereby upgrading the existing industrial chain and producing syngas to be used in the ammonia synthesis units and caprolactam production units of both the Lanhua Group and the Tianze Group. At the same time, coal-fired boilers will be installed as a complement, to replace the coal-fired boilers currently in use by the ammonia synthesis enterprises in the park; the steam generated will be used by these ammonia synthesis enterprises as well as the caprolactam manufacturers in the park. Once this project is put into operation, it will not only help reduce the emission of waste materials, thereby protecting the ecological environment in the area surrounding the enterprise, but it will also lower energy consumption and production costs, playing a positive role in promoting the development of an ecological civilization within the enterprise. II. Basic Information of the Project Project Name: Shanxi Lantian New Energy Chemical Co., Ltd. Bagong Park Gasification Upgrade Project Location: Bagong Equipment Manufacturing Park, Jincheng City, Shanxi Province Scope of Construction: Air separation unit, gasification unit, purification unit, sulfur recovery unit, liquid nitrogen washing system, boiler unit, as well as associated utility systems, auxiliary systems, and environmental protection facilities. III. Name and contact information of the construction unit